Skip to Content
Contact Us

SAP Central Process Scheduling (CPS) 8.0 by Redwood

SAP has released the latest version of SAP CPS - SAP CPS 8.0 by Redwood - on 11 November 11, 2010. This presentation provides an overview on the latest features of SAP CPS 8.0 by Redwood.  Download the Document

Back to top