MRP-based Detailed Scheduling and Subcontracting

I demonstrated that the combination of Subcontracting Without Source Location in PP/DS with subcontracting
components (materials provided to the subcontractor) with MRP-based Detailed Scheduling does not need the following master data in the SAP APO system:
•Transportation lane for the ordered product  Download the Document