Skip to Content
Contact Us

AC 10.0 Pre-Implementation From Post-Installation to First Risk Analysis

This document allows implementation consultants and administrators to setup the required functionality for running a user level risk analysis after the post-installation has been finished. This is by no means a comprehensive guide for setting up the Access Risk Analysis component  Download the Document

Back to top